Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdallah, M, El-Rayes, K and Liu, L (2016) Minimizing Upgrade Cost to Achieve LEED Certification for Existing Buildings. Journal of Construction Engineering and Management, 142(02).

Ahmed, M O, El-adaway, I H, Coatney, K T and Eid, M S (2016) Construction Bidding and the Winner’s Curse: Game Theory Approach. Journal of Construction Engineering and Management, 142(02).

Aljassmi, H, Han, S and Davis, S (2016) Analysis of the Complex Mechanisms of Defect Generation in Construction Projects. Journal of Construction Engineering and Management, 142(02).

AlMaian, R Y, Needy, K L, Walsh, K D and Alves, T d C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(02), 04015061.

Arroyo, P, Tommelein, I D and Ballard, G (2016) Selecting Globally Sustainable Materials: A Case Study Using Choosing by Advantages. Journal of Construction Engineering and Management, 142(02).

Austin, R B, Pishdad-Bozorgi, P and de la Garza, J M (2016) Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Journal of Construction Engineering and Management, 142(02).

Baqerin, M H, Shafahi, Y and Kashani, H (2016) Application of Weibull Analysis to Evaluate and Forecast Schedule Performance in Repetitive Projects. Journal of Construction Engineering and Management, 142(02).

Chen, Q, Jin, Z, Xia, B, Wu, P and Skitmore, M (2016) Time and Cost Performance of Design–Build Projects. Journal of Construction Engineering and Management, 142(02).

Chiang, Y H, Li, V J, Zhou, L, Wong, F and Lam, P (2016) Evaluating Sustainable Building-Maintenance Projects: Balancing Economic, Social, and Environmental Impacts in the Case of Hong Kong. Journal of Construction Engineering and Management, 142(02).

Choi, K, Lee, H W, Mao, Z, Lavy, S and Ryoo, B Y (2016) Environmental, Economic, and Social Implications of Highway Concrete Rehabilitation Alternatives. Journal of Construction Engineering and Management, 142(02).

  • Type: Journal Article
  • Keywords: Life-cycle assessment; Sustainable development; Pavement rehabilitation; Environmental assessment; Economic factors; Land use;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001063
  • Abstract:
    Currently, there is no comprehensive benchmark of life-cycle assessment for the rigid pavement alternatives for highway rehabilitation. To fill this gap, the major objective of this study is to investigate the environmental, economic, and social impacts of the three most widely adopted rigid pavement choices through a life-cycle assessment approach with custom-built economic input-output life-cycle assessment (EIO-LCA) models. Quantity takeoffs were performed for each alternative assuming a 1-lane-km highway rehabilitation. Subsequently, the construction costs of each alternative were computed in order to determine the present values for a life span of 50 years, while at the same time accounting for a different life expectancy for each pavement rehabilitation strategy. The present values were then incorporated into a corresponding EIO-LCA model. The results clearly indicate that continuously reinforced concrete pavement (CRCP) is the most sustainable choice and much preferable to the other alternatives for minimizing negative environmental, economic and social impacts from the life-cycle perspective. This finding champions a wider adoption of CRCP for future sustainable transportation infrastructure development projects, as CRCP’s relatively high initial construction cost can be recouped by long-term sustained benefits. The results and findings of this study can serve as a solid foundation for industry practitioners and decision-makers to make better-informed project decisions when choosing the most sustainable pavement alternatives from a life-cycle perspective.

Dang, T and Bargstädt, H (2016) 4D Relationships: The Missing Link in 4D Scheduling. Journal of Construction Engineering and Management, 142(02).

De Marco, A, Rafele, C and Thaheem, M J (2016) Dynamic Management of Risk Contingency in Complex Design-Build Projects. Journal of Construction Engineering and Management, 142(02).

Hasan, A and Jha, K N (2016) Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India. Journal of Construction Engineering and Management, 142(02).

He, W, Tang, W, Wei, Y, Duffield, C F and Lei, Z (2016) Evaluation of Cooperation during Project Delivery: Empirical Study on the Hydropower Industry in Southwest China. Journal of Construction Engineering and Management, 142(02).

Hyari, K H (2016) Handling Unbalanced Bidding in Construction Projects: Prevention Rather Than Detection. Journal of Construction Engineering and Management, 142(02).

Jarkas, A M (2016) Effect of Buildability on Labor Productivity: A Practical Quantification Approach. Journal of Construction Engineering and Management, 142(02).

Jiang, H, Lin, P and Qiang, M (2016) Public-Opinion Sentiment Analysis for Large Hydro Projects. Journal of Construction Engineering and Management, 142(02).

Jin, R, Han, S, Hyun, C and Cha, Y (2016) Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Journal of Construction Engineering and Management, 142(02).

Kim, T, Lee, H W and Hong, S (2016) Value Engineering for Roadway Expansion Project over Deep Thick Soft Soils. Journal of Construction Engineering and Management, 142(02).

Leung, M, Yu, J and Chong, M L A (2016) Effects of Stress and Commitment on the Performance of Construction Estimation Participants in Hong Kong. Journal of Construction Engineering and Management, 142(02).

Lim, T, Park, S, Lee, H and Lee, D (2016) Artificial Neural Network–Based Slip-Trip Classifier Using Smart Sensor for Construction Workplace. Journal of Construction Engineering and Management, 142(02).

Lines, B C, Sullivan, K T and Wiezel, A (2016) Support for Organizational Change: Change-Readiness Outcomes among AEC Project Teams. Journal of Construction Engineering and Management, 142(02).

Liu, Y and Yeh, I (2016) Building Valuation Model of Enterprise Values for Construction Enterprise with Quantile Neural Networks. Journal of Construction Engineering and Management, 142(02).

Oh, E H, Naderpajouh, N, Hastak, M and Gokhale, S (2016) Integration of the Construction Knowledge and Expertise in Front-End Planning. Journal of Construction Engineering and Management, 142(02).

Rafiei, M H and Adeli, H (2016) A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units. Journal of Construction Engineering and Management, 142(02).

Said, H (2016) Modeling and Likelihood Prediction of Prefabrication Feasibility for Electrical Construction Firms. Journal of Construction Engineering and Management, 142(02).

Seyis, S, Ergen, E and Pizzi, E (2016) Identification of Waste Types and Their Root Causes in Green-Building Project Delivery Process. Journal of Construction Engineering and Management, 142(02).

Shokri, S, Ahn, S, Lee, S, Haas, C T and Haas, R C G (2016) Current Status of Interface Management in Construction: Drivers and Effects of Systematic Interface Management. Journal of Construction Engineering and Management, 142(02).

Shokri, S, Haas, C T, G. Haas, R C and Lee, S H (2016) Interface-Management Process for Managing Risks in Complex Capital Projects. Journal of Construction Engineering and Management, 142(02).

Tymvios, N and Gambatese, J A (2016) Perceptions about Design for Construction Worker Safety: Viewpoints from Contractors, Designers, and University Facility Owners. Journal of Construction Engineering and Management, 142(02).